Cover of Repetitive Project Scheduling: Theory and Methods by Zhang, Li-hui, ISBN 9780128017630
Engineering (General)

Repetitive Project Scheduling: Theory and Methods

Contributor(s): Author Format: Paperback

Paperback ยท ISBN 9780128017630

โ‚น6,558

Inclusive of GST and other taxes

100% Quality Assurance
No Account Creation Required
Fast Delivery
Secured Transactions

Arriving at your doorstep in 10-15 days

Our logisitcs team will make sure everyitem is delivered safely

Key Specifications

ISBN 9780128017630
Publisher Elsevier
Publication date July 2015
Language English
MRP ยฃ41.50 GBP
Page count 114
Item weight 40 g

Repetitive Project Scheduling: Theory and Methods is the first book to comprehensively, and systematically, review new methods for scheduling repetitive projects that have been developed in response to the weaknesses of the most popular method for project scheduling, the Critical Path Method (CPM).

As projects with significant levels of repetitive scheduling are common in construction and engineering, especially construction of buildings with multiple stories, highways, tunnels, pipelines, power distribution networks, and so on, the book fills a much needed gap, introducing the main repetitive project scheduling methods, both comprehensively and systematically.

Users will find valuable information on core methodologies, including how to identify the controlling path and controlling segment, how to convert RSM to a network model, and examples based on practical scheduling problems.