Cover of Multi-Stage Simultaneous Lot-Sizing and Scheduling : Planning of Flow Lines with Shifting Bottlenecks by Seeanner, Florian, ISBN 9783658020880
Operations Research

Multi-Stage Simultaneous Lot-Sizing and Scheduling : Planning of Flow Lines with Shifting Bottlenecks

MULTI-STAGE SIMULTANEOUS LOT-S

Contributor(s): Author Format: Paperback

Paperback Β· ISBN 9783658020880

β‚Ή5,675 2%
β‚Ή5,804

Inclusive of GST and other taxes

100% Quality Assurance
No Account Creation Required
Fast Delivery
Secured Transactions

Arriving at your doorstep in 10-15 days

Our logisitcs team will make sure everyitem is delivered safely

Key Specifications

ISBN 9783658020880
Subtitle MULTI-STAGE SIMULTANEOUS LOT-S
Publisher Springer Gabler
Publication date May 2013
Language English
MRP Β£44.99 GBP
Page count 210
Item weight 62 g

In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed.